<!DOCTYPE HTML PUBLIC "-//W3C//DTD W3 HTML//EN">
<HTML>
<HEAD>

<META content=text/html;charset=iso-8859-1 http-equiv=Content-Type><!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<META content='"MSHTML 4.72.3110.7"' name=GENERATOR>
<STYLE></STYLE>

</HEAD>
<BODY bgColor=#ffffff>
<DIV><FONT color=#000000 size=2>Program 'proj' doesn't know anything about 
datums.&nbsp; The program that</FONT></DIV>
<DIV><FONT color=#000000 size=2></FONT><FONT size=2>does 84/83 datums for the US 
is 'nad2nad'.&nbsp; Execution of nad2nad</FONT></DIV>
<DIV><FONT size=2>is discussed in the (first) interim report.</FONT></DIV>
<DIV><FONT size=2></FONT>&nbsp;</DIV>
<DIV><FONT color=#000000 size=2>Jerry Evenden and the low riders: Katie and 
Daisy-Mae<BR><A 
href="mailto:gevenden@capecod.net">gevenden@capecod.net</A>&nbsp; <A 
href="http://www.capecod.net/~gevenden">http://www.capecod.net/~gevenden</A></FONT></DIV>
<BLOCKQUOTE 
style="BORDER-LEFT: #000000 solid 2px; MARGIN-LEFT: 5px; PADDING-LEFT: 5px">
    <DIV><FONT face=Arial size=2><B>-----Original Message-----</B><BR><B>From: 
    </B>Brent Fraser &lt;<A 
    href="mailto:bfraser@geoanalytic.com">bfraser@geoanalytic.com</A>&gt;<BR><B>To: 
    </B>Proj4 List &lt;<A 
    href="mailto:osrs-proj@remotesensing.org">osrs-proj@remotesensing.org</A>&gt;<BR><B>Date: 
    </B>Tuesday, March 28, 2000 2:11 PM<BR><B>Subject: </B>[OSRS-PROJ] datum 
    transformations<BR><BR></DIV></FONT>
    <DIV><FONT size=2>Frank (and others),</FONT></DIV>
    <DIV>&nbsp;</DIV>
    <DIV><FONT size=2>&nbsp; I've noticed that Proj4 seems to do NAD 27 / 84 
    datum</FONT></DIV>
    <DIV><FONT size=2>conversions, but I'm still a little lost on how to 
    specify</FONT></DIV>
    <DIV><FONT size=2>the parameters on the command line, or drive Proj4 
    using</FONT></DIV>
    <DIV><FONT size=2>the function calls to do the datum 
conversion.</FONT></DIV>
    <DIV>&nbsp;</DIV>
    <DIV><FONT size=2>&nbsp; I've looked thru the Proj4 doc and the ShapeLib 
    contrib </FONT></DIV>
    <DIV><FONT size=2>doc at the info there is on using Proj4 to do datum 
    conversion.</FONT></DIV>
    <DIV>&nbsp;</DIV>
    <DIV><FONT size=2>&nbsp; Is there any additional datum conversion info 
    specific to Proj4?</FONT></DIV>
    <DIV><FONT size=2></FONT>&nbsp;</DIV>
    <DIV><FONT size=2>Thanks!</FONT></DIV>
    <DIV><FONT size=2>Brent Fraser</FONT></DIV>
    <DIV><FONT size=2><A 
    href="mailto:bfraser@geoanalytic.com">bfraser@geoanalytic.com</A> 
    <BR>GeoAnalytic Inc.<BR>#300 , 700 - 4th Avenue SW Calgary, AB T2P 
    3J4<BR>Tel:&nbsp; (403)213-2700 Fax:&nbsp; (403)213-2707<BR><A 
    href="http://www.geoanalytic.com">www.geoanalytic.com</A></FONT></DIV>
    <DIV>&nbsp;</DIV>
    <DIV><FONT size=2></FONT>&nbsp;</DIV></BLOCKQUOTE></BODY></HTML>