[Chameleon-dev] Bug Targeting
Darren Redfern
darren_redfern2000 at hotmail.com
Thu Jul 8 14:54:03 EDT 2004
Hi Everyone:
As most of you have probably noticed (from the copious emails you've been
getting), I went through the Chameleon bug list today and targeted all the
untargeted, open (i.e., NEW/ASSIGNED/REOPENED) bugs.
These targets are meant to act as guidelines for when these bug should be
addressed (not necessarily fixed - but addressed). The targets currently
being used are:
1.99 beta 2 - the beta version we are currently working on trying to release
1.99 beta 3 - the following beta version
1.99 RC 1 - the first Release Candidate version
1.99 Final - the final release of 1.99
2.1 - the technology version to come after versions 1.99/2.0 are out.
Some things to note about the above list:
* there may be additional 1.99 beta and RC versions to those listed above.
When/if we decide that there will be, new targets will be added and bugs
retargeted appropriately.
* there is currently no 2.0 version in the list because 2.0 is meant to be a
release where the technology stays the same, but the product pieces (docs,
training, etc.) change. It is probable that we will want to add 2.0-based
targets at some point to track bugs with those product pieces.
Keep in mind that the targets I have assigned are open to debate, but please
let *me*, as Product Manager, be the one to actually make any changes. Any
debate on individual bug targets should occur within the bug itself. Debate
on larger issues affecting the targeting of many bugs, can be handled
through this email thread.
Currently, the count of open bugs to targets is:
* 1.99 beta 2 - 4 open
* 1.99 beta 3 - 33 open
* 1.99 RC 1 - 57 open
* 1.99 Final - 22 open
* 2.1 - 36 open
Some things I need your feedback on:
* Currently I have set the target for some bugs around the 1.99 Service
Instance to 1.99 beta 3. Do these need to be finished for the beta 2? If so,
I can change them.
* Most items that were feature enhancements I targeted for 2.1. However, a
few that appeared to be already being worked on (and where Paul hadn't
explicitly said "not for 1.99"), I left somewhere in 1.99. Typically, when I
did so, I added a question about their status in my comments.
* Although I know that widgets in the non-base widget pack are not being
*officially* released in 1.99, they are being included with the current
betas and RCs. So, any bugs that were about these non-base widgets, I
targeted no later than 1.99 RC 1. They can always be moved to 2.1 (or
another, widget-pack-specific target) at a later date.
* I targeted many bugs for 1.99 Final. In doing so, I don't want to give the
impression that these ones aren't important - just that they don't
necessarily need to be completely fixed until the final release. Would it be
easier for you all if I moved them the 1.99 RC 1 - would that put them more
in the forefront of your consciousnesses? :-)
It is my intention to monitor the targets for bugs throughout the rest of
the 1.99 product cycle. I will also be looking into bug priorities on a
version by version basis.
Any and all comments are welcome.
Thanks.
Darren
Darren Redfern
Prodcut Manager
DM Solutions Group
More information about the Chameleon-dev
mailing list